Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 18 results ...

Arshad, M F, Thaheem, M J, Nasir, A R and Malik, M S A (2019) Contractual Risks of Building Information Modeling: Toward a Standardized Legal Framework for Design-Bid-Build Projects. Journal of Construction Engineering and Management, 145(04).

Baek, M and Ashuri, B (2019) Analysis of the Variability of Submitted Unit Price Bids for Asphalt Line Items in Highway Projects. Journal of Construction Engineering and Management, 145(04).

Chao, L and Liaw, S (2019) Fuzzy Logic Model for Determining Minimum Overheads-Cum-Markup Rate. Journal of Construction Engineering and Management, 145(04).

Deng, Y, Gan, V J L, Das, M, Cheng, J C P and Anumba, C (2019) Integrating 4D BIM and GIS for Construction Supply Chain Management. Journal of Construction Engineering and Management, 145(04).

Hacker, M E, Kaminsky, J and Faust, K M (2019) Legitimizing Involvement in Emergency Accommodations: Water and Wastewater Utility Perspectives. Journal of Construction Engineering and Management, 145(04).

Jin, R and Chen, Q (2019) Overview of Concrete Recycling Legislation and Practice in the United States. Journal of Construction Engineering and Management, 145(04).

Kereri, J O and Harper, C M (2019) Social Networks and Construction Teams: Literature Review. Journal of Construction Engineering and Management, 145(04).

Kim, J, Ham, Y, Chung, Y and Chi, S (2019) Systematic Camera Placement Framework for Operation-Level Visual Monitoring on Construction Jobsites. Journal of Construction Engineering and Management, 145(04).

Li, H, Wang, M and Dong, X (2019) Resource Leveling in Projects with Stochastic Minimum Time Lags. Journal of Construction Engineering and Management, 145(04).

Li, Y, Li, G, Wang, T, Zhu, Y and Li, X (2019) Semicustomized Design Framework of Container Accommodation for Migrant Construction Workers. Journal of Construction Engineering and Management, 145(04).

Mitikie, B B and Lee, T S (2019) Experimental Investigation of Enzyme Stabilization and Its Effect on Clay Brick. Journal of Construction Engineering and Management, 145(04).

Nasirian, A, Arashpour, M, Abbasi, B and Akbarnezhad, A (2019) Optimal Work Assignment to Multiskilled Resources in Prefabricated Construction. Journal of Construction Engineering and Management, 145(04).

Noorizadeh, A, Peltokorpi, A and Avkiran, N K (2019) Supplier Performance Evaluation in Construction Projects: Challenges and Possible Solutions. Journal of Construction Engineering and Management, 145(04).

  • Type: Journal Article
  • Keywords: Supplier evaluation; Construction projects; Data envelopment analysis; Changing operating environment; Nonhomogenous decision-making units;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0001616
  • Abstract:
    Supplier performance analysis can enlighten a construction company about improvement possibilities for better project outcomes. However, for systematic evaluation of a supplier across projects, changing the operating environment between projects should be addressed. Therefore, we first elaborate how supplier evaluation is challenged due to differences between projects in three characteristic groups: project product and location characteristics, project organization characteristics, and buyer–supplier transaction characteristics. We next discuss the possibility of applying data envelopment analysis (DEA) for supplier evaluation in construction, and argue how changing the operating environment can lead to nonhomogenous decision-making units in DEA. Building on these, we propose the process for supplier evaluation in the presence of a changing operating environment and different input–output profiles. Characteristics of 12 projects and supplier evaluations in 44 projects are used to illustrate evaluation challenges. The research extends current knowledge on supplier evaluation in construction by underlining how changing the operating environment across projects challenges systematic performance evaluation and by suggesting the process which further research could develop toward practical applications.

O’Connor, J T and Mock, B D (2019) Construction, Commissioning, and Startup Execution: Problematic Activities on Capital Projects. Journal of Construction Engineering and Management, 145(04).

Oswald, D, Wade, F, Sherratt, F and Smith, S D (2019) Communicating Health and Safety on a Multinational Construction Project: Challenges and Strategies. Journal of Construction Engineering and Management, 145(04).

Son, J, Khwaja, N and Milligan, D S (2019) Planning-Phase Estimation of Construction Time for a Large Portfolio of Highway Projects. Journal of Construction Engineering and Management, 145(04).

Wu, L, Jia, G and Mackhaphonh, N (2019) Case Study on Improving the Effectiveness of Public Participation in Public Infrastructure Megaprojects. Journal of Construction Engineering and Management, 145(04).

Xiong, B, Skitmore, M, Xia, P, Ballesteros-Pérez, P, Ye, K and Zhang, X (2019) Impact of Corporate Credit Scoring on Construction Contractors in China. Journal of Construction Engineering and Management, 145(04).